Talisman Mining Provides Drilling Update at Wonmunna Iron Project

Talisman Mining Provides Drilling Update at Wonmunna Iron Project

Talisman Mining announced that assay results have been received for a further 25 RC drillholes completed as part of the program of gridded resource drilling at the North Marra Mamba prospect, Wonmunna project, East Pilbara region, Western Australia. Significant drill intercepts include 34m @ 59.16% Fe including 22m @ 60.50% Fe. The company advised further that assay results have been received for a further 17 RC drillholes completed as part of the program of reconnaissance drilling at the South Marra Mamba prospect, Wonmunna project. Significant results include 34m @ 58.34% Fe including 22m @ 61.10% Fe.

Original Announcement: Wonmunna Iron Project – Drilling Update

Share this post