La Quinta Resources Announces Commencement of Its Drilling Program at Easter Project

La Quinta Resources Announces Commencement of Its Drilling Program at Easter Project

Tuesday, August 17th 2010

La Quinta Resources Corporation report that it has commenced its drilling program on its Easter Project located in S.E Nevada.

La Quinta plans to drill approximately 3,200 ft of reverse circulation percussion drilling in 16 drill holes sited in the outcrop of the Main Vein at Easter. Hole depths will average 200 ft, and are designed to be integrated with the recently completed 43-101 compliant resource calculation. The core area of mineralization has an outcrop approximately 1,000 ft in strike length with additional flexure segments on both the east and west aggregating more than 1,500 ft total exposed veining. The main outcrop is exposed as much as 200 ft above the valley floor with widths of 30 ft to more than 100 ft. This program is designed to sample the previously unsampled exposed part of the Main Vein in multidimensional aspect.

Share this post