L&M Petroleum Releases Dean #1A Drilling Progress Report

L&M Petroleum Releases Dean #1A Drilling Progress Report

L&M Petroleum has announced that at 06:00 today, the Dean-1A well was drilling ahead at a depth of 1156m after completing operations to set 9-5/8′ intermediate casing at 1073m. The borehole is now vertical as a result of directional drilling operations. An encouraging gas reading of 3.87% was recorded at 1155m from what is believed to be a fracture within a thin limestone bed.

Original Announcement: Dean #1A drilling progress report

Share this post