Stingray Files Positive Feasibility Study for El Pilar Copper Project
Stingray Copper Inc. announce that it has filed at SEDAR the NI 43-101 Technical Report, “El Pilar, Executive Summary, Sonora, Mexico by M3 Engineering & Technology Corporation” on the Corporation’s 100% owned El Pilar oxide copper project. Based on the positive results of the Study, the Board of Directors of the Corporation has approved the project for development as a low cost, open pit mine with a solvent extraction and electro-winning plant to treat oxide mineral reserves, subject to financing.
The Study can be found on the Corporation’s website.