Stingray Files Positive Feasibility Study for El Pilar Copper Project

Stingray Files Positive Feasibility Study for El Pilar Copper Project

Stingray Copper Inc. announce that it has filed at SEDAR the NI 43-101 Technical Report, “El Pilar, Executive Summary, Sonora, Mexico by M3 Engineering & Technology Corporation” on the Corporation’s 100% owned El Pilar oxide copper project. Based on the positive results of the Study, the Board of Directors of the Corporation has approved the project for development as a low cost, open pit mine with a solvent extraction and electro-winning plant to treat oxide mineral reserves, subject to financing.

The Study can be found on the Corporation’s website.

Share this post