Talisman Mining Provides Update on Wonmunna Iron Project

Talisman Mining Provides Update on Wonmunna Iron Project

Talisman Mining provided a drilling update, reporting that assay results have been received for a further 25 RC drillholes completed as part of the program of gridded resource drilling at the NMM (North Marra Mamba) prospect, Wonmunna project, East Pilbara region, Western Australia. Significant drill intercepts include 34m @ 59.16% Fe including 22m @ 60.50% Fe. Assay results have been received for a further 17 RC drillholes completed as part of the program of reconnaissance drilling at the SMM (South Marra Mamba) prospect, Wonmunna project. Significant results include 34m @ 58.34% Fe including 22m @ 61.10% Fe.

Original Announcement: Wonmunna Iron Project – Drilling Update

Share this post